[Case Study] Construction of a clean room for a cosmetics manufacturing factory within a warehouse.
A case where the effective height for construction was secured by making the existing ceiling skeletal.
This is a case where a new clean room was constructed at the request of a cosmetics manufacturer. It was necessary to design and build it under the condition of cleanliness level 100,000, in accordance with the general cosmetics manufacturing industry permit. Before constructing the clean room, the existing ceiling was opened up to utilize the ceiling space and ensure effective height. To achieve the cleanliness and pest control measures required by the client, it was necessary to overcome various challenges, but through collaboration with the design team, we were able to construct a clean room that exceeded their expectations. [Issues] - There was a concern about insufficient effective height due to the construction location being on the mezzanine of a gable warehouse. - High cooling capacity was required. - Floor-mounted air conditioning units and ceiling line ducts were not desirable. - Management of internal pressure, dust control from inside, and pest control measures against flying and crawling insects were also necessary. *For more details, please refer to the PDF document or feel free to contact us.
- Company:蒲田工業
- Price:Other